AEVOMIND INSIGHTS — INSTALLERS & FIELD SERVICE

F gas records and leak checks for heat pump and air-conditioning businesses: what GOV.UK requires, and how an asset register keeps it

3 November 2026 · 11 min read · By the AevoMind team

A row of seven sealed glass vials, each with a thin gold ring around it, one ring glowing brighter, standing for individual units each with their own check status.

GOV.UK says anyone operating or servicing stationary heat pumps or air conditioning holding F gas equivalent to 5 tonnes of carbon dioxide or more must keep records for 5 years, and check for leaks on a schedule set by the charge. Each unit needs its own history. Software can keep that register and show what is due, but a competent person must judge whether a repair worked and which rules apply.

The short answer

If your business installs or services stationary heat pumps or air conditioning that holds F gas equivalent to 5 tonnes of carbon dioxide or more, GOV.UK says you must keep records for 5 years on each unit: the gas it was installed with, any gas added, every leak check and its result, and what happened to recovered gas. The leak checks themselves have to happen at least every 12 months, and more often for larger charges.

That is a per-unit memory problem, and it is why it suits software. A system can hold one record per unit, show which checks are due, and keep five years of history ready to produce. It cannot decide whether a repair has worked or whether a particular refrigerant is covered. A competent person does that.

Three glass jars of increasing size with gold lids, holding rising levels of pale mist, standing for larger gas charges that need more frequent leak checks.
Three sizes of charge, and the check frequency steps up with each.

What has to be on the record for each unit

The GOV.UK page for recording F gas in equipment you own or service says “You must keep records for 5 years” on four things:

If you are the user or operator of the equipment, you also keep the name, address and certificate number of any companies used to install, service or decommission it. And the guidance is plain about why it matters: “The Environment Agency may ask to see your records during an inspection.”

Notice the shape of that list. Every item belongs to one specific unit, and every item arrives from a different visit, by a different engineer, on a different day. A record that lives in a job sheet or a van notebook has to be found again, unit by unit, years later.

The leak-check schedule is set by the charge, not by the calendar

How often a unit must be checked “depends on the” amount of F gas in it and its global warming potential, according to the GOV.UK leak-check guidance. Both are combined into a carbon dioxide equivalent: the guidance on calculating it multiplies the mass of gas in metric tonnes by the gas’s global warming potential, and notes that product labels usually show the mass in kilograms.

The tiers are:

Fitting automatic leak detection changes the arithmetic: “you can double the period of time allowed between leak checks”. GOV.UK’s own example is a 5-tonne unit that then needs checking every 2 years. There is also an exception: there is no maximum period between checks on hermetically sealed refrigeration and air-conditioning systems unless they hold 10 tonnes of carbon dioxide equivalent.

Yearly leak checks start at 2.4 kg of R410A, and automatic detection at 240 kgMass of HFC 410A at which each leak-check tier begins, from GOV.UK's table of common HFCs
Checks at least every 12 months (5 tonnes CO2e)2.4 kg
Checks at least every 6 months (50 tonnes CO2e)24.0 kg
Automatic leak detection required (500 tonnes CO2e)240.0 kg

Source: GOV.UK, Checking F gas equipment for leaks (Environment Agency and Defra, published 21 August 2019, no later update shown), table of leak-check frequency for common HFCs, column for HFC 410a. The tiers are set by the carbon dioxide equivalent of the gas in the equipment, so a gas with a different global warming potential reaches each tier at a different mass. Check the guidance for your refrigerant.

Show the data
HFC 410A (kg)
Checks at least every 12 months (5 tonnes CO2e)2.4 kg
Checks at least every 6 months (50 tonnes CO2e)24.0 kg
Automatic leak detection required (500 tonnes CO2e)240.0 kg

The chart shows why the schedule cannot be remembered. For one gas, HFC 410A, the three tiers begin at 2.4 kg, 24 kg and 240 kg. For another gas the numbers are different. Two units in the same street can be on different cycles because of what is on their labels, so the due date has to be calculated per unit and stored with it.

Five upright glass slabs in a row with a single gold line of light running through all of them, standing for five years of records kept together.
Five years of records, kept together for every unit.

When a check finds a leak, the clock restarts

The same guidance gives one more date to track: “If you find a leak during a check, you must repair it as soon as possible and repeat the test within a month to check the repair worked.” So a leak creates a chain on that unit: the finding, the repair, any gas added (which goes on the record), and a recheck due within a month.

It is also where the law bites. GOV.UK says that you are breaking the law if you don’t have the right leak checks in place, or don’t fix leaks, and that “You could receive a civil penalty.” The guidance does not state an amount, so we do not either.

Who is responsible: the owner, the servicer, or both

“Responsibility for stopping leaks of F gas from equipment is shared between” users of the equipment and the service technicians who install, maintain or dispose of it. Users are responsible for getting equipment checked, and for rented-out equipment the owner may be responsible rather than the end user, depending on the rental agreement.

For a servicing business, that sharing means the operator of a unit, such as the owner of a block of air-conditioning units, may need the dates and results of each check from you. GOV.UK says users must also keep the details of any company used to service their equipment, so records can be asked for from both sides. If yours live only in your own paperwork, each request becomes a search.

Company certification sits alongside this. The GOV.UK certification page says a company, including a sole trader, must be certified by an approved body to service stationary equipment containing F gas that others operate, and lists air conditioning, refrigeration and fire protection. To be certified you must be able to demonstrate that you “employ enough trained staff to do the work” and “have a written procedure for how you handle F gases safely and minimise emissions”. That page does not name heat pumps, whereas the records and leak-check pages do. How the certification rule applies to heat pump work is a question for a certification body, not for this article.

A sealed glass vial held in a brushed-gold clamp beside a small glass lens, standing for a unit being inspected for leaks.
Each unit has a record of what was found, when, and by whom.

What software can do, and what it cannot

This is asset-register work. The chart below uses illustrative figures, not client data, for a business servicing about 400 units with F gas.

The record-keeping behind a service base of about 400 unitsIllustrative hours a month for a business servicing about 400 units with F gas, by hand and with a system
By handWith a system
Working out which units are due a leak check this month10 hrs1 hrs
Getting each check's date and result onto the right unit's record14 hrs4 hrs
Linking gas added and gas recovered to the right unit12 hrs4 hrs
Pulling five years of records for one site when asked8 hrs1 hrs
Judging whether a repair needs a recheck and what the result means4 hrs3 hrs

Illustrative inputs, not client data. Totals: 48 hours a month by hand against 13 with a system. Judging whether a repair worked falls least, on purpose: a competent person decides that. A system removes the finding, copying and chasing, not the judgement. Substitute hours you have measured.

Show the data
By handWith a system
Working out which units are due a leak check this month10 hrs1 hrs
Getting each check's date and result onto the right unit's record14 hrs4 hrs
Linking gas added and gas recovered to the right unit12 hrs4 hrs
Pulling five years of records for one site when asked8 hrs1 hrs
Judging whether a repair needs a recheck and what the result means4 hrs3 hrs

The shape is the point. Finding which units are due, copying results onto the right record and chasing paperwork is mechanical. Judging whether a repair worked is not, and those hours barely move.

An asset register with full service history, which is what our inventory and assets system describes, can hold the following against each unit:

What it cannot do is decide whether your refrigerant is an F gas, whether a unit falls under the rules, whether a repair has worked, or whether your company holds the right certification. Those are decisions for a competent person and your certification body. Our installer platform is built on one shared record per job and per asset, and the specifics are set in an assessment visit. For the grant and registration side of heat pump work, see MCS installer job management and Boiler Upgrade Scheme admin, and for the general case, equipment and asset tracking.

A looping band of glass with one small gold droplet of light on it, standing for a leak found, repaired and checked again.
A leak found, repaired and checked again, with the date of each step recorded.

Where to start this week

  1. List the units you service and the refrigerant and charge on each label, so you know which fall at or above 5 tonnes carbon dioxide equivalent.
  2. Work out each unit’s tier and its next leak check, using the GOV.UK calculation method rather than a rule of thumb.
  3. Pick one unit and try to produce its five-year record in a few minutes: installed charge, gas added, every check and result, and where recovered gas went.
  4. Check who holds the records when you service equipment that others operate, and what you give the operator.
  5. Ask your certification body how company certification applies to the work you do.

This is general information based on the GOV.UK guidance as we read it on 3 November 2026. The records and leak-check pages show a publication date of 21 August 2019 and no later update, so confirm the current position before relying on it. We have not covered the F-gas Regulations themselves, the list of global warming potentials or arrangements in Northern Ireland, and this is not legal advice.

Frequently asked questions

How long do F gas records have to be kept?

GOV.UK says you must keep records for 5 years on the quantity and type of gas in the equipment when it is installed, the quantity and type added during maintenance (for example in leak repairs), the dates and results of all mandatory leak checks, and what you have done to recover and dispose of gas. The rule applies to equipment you operate or service that contains F gas equivalent to 5 tonnes or more of carbon dioxide, and the list of equipment includes stationary heat pumps.

How often must F gas equipment be checked for leaks?

It depends on the carbon dioxide equivalent of the gas in the equipment. GOV.UK sets at least every 12 months for 5 to less than 50 tonnes, at least every 6 months for 50 to less than 500 tonnes, and automatic leak detection is required at 500 tonnes or more for most equipment. Fitting automatic leak detection doubles the allowed period between checks. For HFC 410A, GOV.UK's table gives 2.4 kg, 24 kg and 240 kg as the masses at which those tiers begin.

What must you do if a leak is found?

GOV.UK says that if you find a leak during a check, you must repair it as soon as possible and repeat the test within a month to check the repair worked. It adds that you are breaking the law if you do not have the right leak checks in place or do not fix leaks, and could receive a civil penalty. The guidance does not state penalty amounts, and this article does not either.

Who is responsible, the equipment owner or the service company?

GOV.UK says responsibility for stopping leaks is shared between users of equipment containing F gas and the service technicians who install, maintain or dispose of it. Users are responsible for getting equipment checked, and where equipment is rented out the owner may be responsible for leak checks instead of the end user, depending on the rental agreement. A user or operator must also keep the name, address and certificate number of any company used to install, service or decommission the equipment.

Does a company need certification to work on equipment containing F gas?

GOV.UK says a company, including a sole trader, must be certified by an approved body to service stationary equipment containing F gas that is operated by others, and the page lists air conditioning, refrigeration and fire protection. To be certified a company must show it employs enough trained staff and has a written procedure for handling F gases safely and minimising emissions. That page does not name heat pumps, so check with a certification body how it applies to your work.