AEVOMIND INSIGHTS — INSTALLERS

Boiler Upgrade Scheme admin for installers: the deadlines on every job, and how software tracks them

28 October 2026 · 10 min read · By the AevoMind team

A glass cube encircled by four glowing arcs of light of different lengths, standing for several separate deadlines running on one installation job.

A Boiler Upgrade Scheme job is not one deadline but several running at once: 120 days after commissioning to apply, 14 days for the owner's consent, 3 or 6 months of voucher validity and 30 days for the MCS certificate. Installers sent Ofgem 36% more applications in the latest quarter. Software does not make the application, but it keeps every clock and every piece of evidence in one place.

The short answer

A Boiler Upgrade Scheme job is not one deadline but several, all running at once and all started by different events: the 120 days after commissioning in which an application must be properly made, the 14 days the property owner has to give consent, the 3 or 6 months a voucher stays valid, and the 30 days MCS allows for the certificate. Multiply that by every job in flight and you have a deadline-tracking problem that sits on top of the installation work.

Software will not decide whether a property is eligible, and the application itself is made in Ofgem’s portal. What it does is keep the evidence and the clocks for every job in one place, so none of them lapses because nobody was watching.

Four small gold hourglasses of different sizes in a row, standing for the overlapping time limits on a single grant application.
Several clocks run on every job, and each one starts at a different moment.

The volume is rising

This is a growing workload, not a niche one. In the three months to 31 July 2026, installers submitted 17,073 voucher applications, up from 12,555 the quarter before: 36% more. Ofgem’s table shows 10,431 vouchers issued in the same quarter (Ofgem quarterly report, Issue 17).

Installers sent Ofgem 36% more voucher applications in the latest quarterVoucher applications received and vouchers issued each quarter, Boiler Upgrade Scheme, August 2025 to July 2026
Voucher applications receivedVouchers issued
Aug to Oct 202511,5128,290
Nov 2025 to Jan 202611,2787,113
Feb to Apr 202612,5558,450
May to Jul 202617,07310,431

Source: Ofgem, Boiler Upgrade Scheme Quarterly Report, Issue 17 (data to 31 July 2026). Applications are those received in each quarter. Vouchers issued exclude vouchers that have since expired or been revoked or withdrawn, and figures for earlier quarters may be revised. The two columns are not the same group of applications, so the gap between them is not a rejection rate.

Show the data
Voucher applications receivedVouchers issued
Aug to Oct 202511,5128,290
Nov 2025 to Jan 202611,2787,113
Feb to Apr 202612,5558,450
May to Jul 202617,07310,431

Read that gap carefully. Ofgem’s own footnotes say the vouchers-issued column excludes vouchers that have since expired or been revoked or withdrawn, and the two columns do not describe the same group of applications, so the difference is not a rejection rate and we do not present it as one. What the data does show is the scale: tens of thousands of applications a year, each one an installer assembling evidence and waiting.

The clocks on every job

All of the following come from Ofgem’s installer guidance, version 5.1 (for applications properly made on or after 28 April 2026) unless stated otherwise:

Two further facts matter for the admin. Supporting evidence is the installer’s job: “It is the installer’s responsibility to gather and upload supporting evidence to the BUS Portal as part of the application, not the property owner”. And installers must obtain evidence of the previous heating system, because it may be requested in an audit or compliance check.

A track of light that stops at a bright line with the track beyond it dark, standing for an application that misses its deadline and expires.
Miss the line and the track beyond it is gone: an expired voucher cannot be extended.

Where a job can lapse

None of this is difficult on a single job. It becomes difficult across twenty, because the clocks do not line up. A job commissioned in the first week of the month has its 120 days ending in a different week from one commissioned in the third, and each has its own consent window and its own voucher expiry. The ways a job can slip are specific:

The admin, measured

Take an illustrative installer commissioning 20 Boiler Upgrade Scheme jobs a month.

The scheme admin behind a month of Boiler Upgrade Scheme jobsIllustrative hours a month for an installer commissioning 20 Boiler Upgrade Scheme jobs, by hand and with a system
By handWith a system
Assembling the stage 1 evidence15.0 hrs5.0 hrs
Chasing consent and queries8.0 hrs2.0 hrs
Tracking the deadlines on every job6.0 hrs1.0 hrs
Redemption and payment reconciliation7.0 hrs2.5 hrs

Illustrative inputs, not client data. Totals: 36 hours a month by hand against 10.5 with a system. The scheme rules are identical either way, and the application itself is made in Ofgem's own portal. A system keeps the record around it: the evidence, the clocks and the reconciliation. Substitute hours you have measured.

Show the data
By handWith a system
Assembling the stage 1 evidence15.0 hrs5.0 hrs
Chasing consent and queries8.0 hrs2.0 hrs
Tracking the deadlines on every job6.0 hrs1.0 hrs
Redemption and payment reconciliation7.0 hrs2.5 hrs

That is 36 hours a month by hand against 10.5 with a system: about 25 hours back a month, or around 306 hours across a year, nearly two months of one person at 162.5 hours, using the ONS median full-time week of 37.5 paid hours. The bigger point is the third row. Tracking deadlines by hand costs time, but missing one costs a grant, which is why the figure to measure in your own business is the number of jobs that came close to lapsing. The method is the one in how many hours automation can save.

A blank frosted glass plate with a gold clip, standing for the certificate an installer must hold to apply.
The MCS certificate has to exist before the grant can be redeemed.

What software can do here — and what it can’t

It cannot make an application for you or decide whether a property is eligible; the application is made in Ofgem’s portal. What it can do is hold the record around it, so the deadlines stop living in people’s heads:

AevoMind’s compliance and certification system is built around scheme requirements mapped to evidence, with expiry dates that chase themselves, and it sits inside the wider installers platform and field service system. For the buying decision, see field service software for solar and heat pump installers.

A date to diarise

Ofgem’s installer sign-in page says: “From 3 November 2026 you will require a GOV.UK One Login account to access the Boiler Upgrade Scheme installer account area.” It adds that installers can create their One Login account before that date. If the person who normally logs in is away that week, find out now who holds the access (Ofgem installer sign-in).

A stream of light passing cleanly through four open ring-shaped gates, standing for an application that clears every stage and is paid.
A job that clears every stage, from application to payment.

Where to start this week

  1. List every commissioned job with no voucher application yet, and the date its 120 days ends.
  2. List every live voucher with its expiry date, sorted soonest first.
  3. Check which owners have not yet given consent, and how long ago Ofgem contacted them.
  4. Create your GOV.UK One Login before 3 November, and confirm who else needs access.
  5. Time one month of scheme admin honestly, including the chasing, before deciding whether a system earns its place.

The test is simple: could you say right now which of your open jobs has the nearest deadline, and what it is, without opening a spreadsheet or asking anyone? This is general information; the Ofgem guidance is the authority for any individual application.

Frequently asked questions

How long do installers have to apply for a Boiler Upgrade Scheme voucher after commissioning?

Where an installation is commissioned before the application, Ofgem's installer guidance says the application must be properly made within 120 days of the commissioning date, and that applications outside this window will not be eligible, including re-applications following a withdrawal, revocation or voucher expiry. An application is only properly made once Ofgem has all the information it needs and the property owner has given consent and identity verification.

What happens if the property owner does not give consent in time?

The property owner must give consent through the link in Ofgem's email within 14 days of being contacted. If consent is not received within 14 days, the voucher application will expire and may be rejected. In our reading, because an application is only properly made once consent is in, a lapsed consent can also eat into the 120-day window, which is why chasing it early matters.

How long are Boiler Upgrade Scheme vouchers valid for?

Vouchers for air source heat pumps and biomass boilers are valid for 3 months, and vouchers for ground source heat pumps for 6 months. An installer can submit the voucher redemption application any time within the validity period, once the system has been commissioned. The installer must provide the MCS installation certificate number, their BUS installer account ID and the unique voucher ID, plus a biomass emissions certificate where one applies.

How long does Ofgem take to pay once a voucher is redeemed?

Ofgem runs a weekly payment schedule, and payments are usually made within five working days of approval. It says banks may need up to three to five additional working days to clear the funds. If payment has not arrived ten working days after the installer is notified of a successful redemption, Ofgem asks installers to contact it. Installers are responsible for keeping their bank details up to date, and a payment sent to an out-of-date account will not be re-issued.

Can software manage the Boiler Upgrade Scheme process for an installer?

It can hold the record around the process: the evidence for each job, the clocks that are running, who has been chased and when, and which grants have been paid against which jobs. The application itself is made by the installer in Ofgem's BUS portal, and whether a particular property is eligible remains a decision for the installer and Ofgem. The value is that no deadline depends on someone remembering it.