The EV chargepoint grant in its final year: what installers must evidence on every claim, and how software keeps it

14 November 2026 · 11 min read · By the AevoMind team

A clear glass cable with a thin gold line running through it, ending in a softly glowing green plug connected to a glass ring socket, standing for an installed chargepoint connection.

OZEV's home and workplace chargepoint grants run for a final year to 31 March 2027. Authorised installers must install only eligible models, upload the equipment details, an invoice and labelled photos with each claim, and accept audits before or after payment, with payment of other claims at risk if records are not provided. Software can capture and keep the evidence on site, but OZEV confirms eligibility.

The short answer

OZEV’s guidance for installers says: “Five chargepoint grant schemes are available until 31 March 2027 with new grant rates.” The home and workplace grants have been extended for a final year, and an installer who wants to claim has to be OZEV authorised, install only eligible equipment, upload specific evidence for every claim and accept that OZEV can audit the work, before or after payment.

For an installer doing dozens of these a month, the job is mostly evidence: the right model and serial number, the right four photos, one invoice per application, matched to the right scheme and claim. A connected system can capture that on the engineer’s phone at the job and hold it against the right claim. It cannot decide whether a customer is eligible. OZEV confirms that, and the installer helps the customer understand the criteria.

A small rounded green wall box with a single gold ring on its front, standing for an installed chargepoint on a wall.
A chargepoint installed, with its model and serial number recorded at the time.

What an authorised installer has to do

The guidance opens with a blunt condition: “You need to be an OZEV authorised installer to claim the OZEV electric vehicle (EV) chargepoint grants.” It then lists the responsibilities. An installer must:

Two of those are record-keeping rules in disguise. The invoice has to be one per application, so each install needs to be tied to exactly one application, and the grant cannot be charged in advance, so the invoice has to show the customer’s share rather than the grant. A job that starts from a quote, passes through an application and ends with an invoice and a claim is a chain of linked records.

The claim process, scheme by scheme

For the grants for renters and flat owners and for residential landlords, the sequence is: the customer asks for a quote and fills in the application; OZEV contacts the installer and the applicant to confirm the applicant is eligible; the installer installs the eligible chargepoint the customer chose; and the installer submits the claim using the link OZEV provides, uploading photos and information; OZEV assesses it and pays the grant if it is successful.

The grant for households with on-street parking has a different path. OZEV confirms the customer’s eligibility and sends them an installer’s terms and conditions letter to share with the installer. If the installer is not installing the cross-pavement solution itself, it has to make sure the customer has a cross-pavement charging solution provider. The installer then submits a claim form, supporting information and its invoice. The Workplace Charging Scheme has its own separate process.

So the same installer, in the same week, can be working through three different workflows with different links, forms and documents. That is why the scheme and the claim reference are things to record against the job from the start.

Clear glass squares glowing soft green arranged around a central gold ring, standing for the different views of an installation that a claim needs.
Four views of an installation, each one asked for by name.

The evidence: four photos, a serial number and an invoice

To submit a claim, the guidance says an installer must provide the details of the chargepoints installed, which means the make and model “as listed on the OZEV eligible equipment list” and the serial number, and a copy of the invoice. For the flats and renters and landlord grants, from 1 April 2026 claims must include photographic evidence:

And: “All pictures must be clearly labelled and should support statements in your grant claim.” The guidance adds that OZEV reserves the right to seek further information or documentary evidence from relevant parties.

This is evidence that only exists if somebody takes it on site. A photo missed on the day means a return visit, or a claim that cannot be completed. And the model has to be on the eligible equipment list at the time, which is a check that belongs before the install, not after.

The rate, the platform and the deadlines

The guidance says the flats and renters scheme and the residential landlord scheme have operated on a new platform since 1 April 2026, with customers able to apply for an increased grant rate of up to £500 per socket. It gives separate contacts for claims at the new rate and for claims at the previous rate of up to £350.

The maximum grant per socket is up to 500 pounds on the new platform, from up to 350Maximum grant per socket for the flats and renters and residential landlord chargepoint grants, in pounds
Previous rate (claims handled on the previous platform): up to350
New rate from 1 April 2026 (new platform): up to500

Source: OZEV, Electric vehicle chargepoint and infrastructure grant guidance for installers (GOV.UK, last updated 7 July 2026). The guidance says the flats and renters and residential landlord schemes have operated on a new platform since 1 April 2026, when customers could apply for an increased grant rate of up to 500 pounds per socket, and gives separate contacts for claims at the new rate and at the previous rate of up to 350 pounds. These are maximums; the grant paid depends on the scheme criteria and the claim.

Show the data
Up to, per socket (pounds)
Previous rate (claims handled on the previous platform): up to350
New rate from 1 April 2026 (new platform): up to500

That makes the date and the platform a fact about each claim. An installer with applications from before and after 1 April 2026 in progress has two populations of claims with different rates and different people to call. Other dates in the guidance matter too: three schemes closed to installer claims on 26 May 2026, with further information due by 13 July 2026, and the five remaining schemes run until 31 March 2027. If a grant ends or the amount changes, the government will “aim to provide 4 weeks’ notice” and “honour claims made before any public announcement, subject to the grant criteria”.

A small green folder with a clear glass card held on its cover by a gold paperclip, standing for an application's documents kept together.
One folder per application: invoice, equipment details and evidence together.

Audit: why the records have to last

The guidance is direct: “OZEV will select some installations to be audited.” OZEV or a third party checks grant data, statements and records held by the installer and the customer, possibly with an on-site visit that needs access to the chargepoint and its supporting equipment, and the audit can take place before or after a claim is paid. The sanction for not cooperating is wider than the single claim: “we may withhold or reclaim payment of the grant and any other claims that have been submitted for any grant”.

That last clause is the one to read twice. A gap in one job’s paperwork can put the payment on others at risk. The sensible position is to treat every grant job as one that may be audited, with the evidence kept together and findable.

What software can do, and what it cannot

The chart below uses illustrative figures, not client data, for an installer completing about 120 grant-funded chargepoint installations a month.

Most of the claim work is chasing evidence and matching recordsIllustrative hours a month for an installer completing about 120 grant-funded chargepoint installations a month, by hand and with a system
By handWith a system
Chasing photos and serial numbers from the engineer after the job14 hrs3 hrs
Matching each install to the right application, scheme and claim link10 hrs2 hrs
Preparing one invoice per application and uploading the claim8 hrs3 hrs
Tracking claims, payments and queries by claim number6 hrs2 hrs
Deciding whether a customer or a site is eligible6 hrs5 hrs

Illustrative inputs, not client data. Totals: 44 hours a month by hand against 15 with a system. Deciding whether a customer or site is eligible falls least, on purpose: the guidance says OZEV confirms eligibility and installers help customers understand the criteria, and a person has to judge each case. A system removes the chasing and matching, not the judgement. Substitute hours you have measured.

Show the data
By handWith a system
Chasing photos and serial numbers from the engineer after the job14 hrs3 hrs
Matching each install to the right application, scheme and claim link10 hrs2 hrs
Preparing one invoice per application and uploading the claim8 hrs3 hrs
Tracking claims, payments and queries by claim number6 hrs2 hrs
Deciding whether a customer or a site is eligible6 hrs5 hrs

The shape matters more than the figures: chasing and matching shrink, while the judgement about eligibility does not. Our installer platform lists surveys and quotes, scheduling, an engineer mobile app, van stock, scheme compliance, handover packs and aftercare on one shared record, and the field service and mobile system describes photos, signatures and custom forms captured on site. Used well, a system can:

We do not claim to submit claims to OZEV: the guidance says each claim is submitted using a link or form that OZEV provides. A system keeps the evidence those submissions are made from. It cannot decide whether a customer is eligible, which OZEV confirms, or whether a particular model is on the list today. The details are set in an assessment visit. For the heat pump side of the same business, see Boiler Upgrade Scheme admin for installers and F gas records and leak checks.

A glass magnifying lens over a row of small green beads with one gold bead, standing for a claim examined closely in an audit.
A claim that holds up when it is examined closely.

Where to start this week

  1. List your open grant jobs by scheme, and note which were applied for before and after 1 April 2026.
  2. Check the engineer’s job form: does it require the four photos and the serial number before the job can be closed?
  3. Check your equipment list against OZEV’s current eligible equipment list.
  4. Pick one completed job and test an audit: could you produce the invoice, the model and serial number, the photos and the application reference in minutes?
  5. Diarise 31 March 2027, and the 4 weeks’ notice the government aims to give before a grant ends or changes.

This is general information based on OZEV’s guidance for installers (last updated 7 July 2026) as we read it on 14 November 2026. We have not reviewed the specifications page, the eligible equipment list, the terms and conditions, the scheme eligibility rules or the Workplace Charging Scheme guidance, and the guidance may be updated. It is not advice on claiming any particular grant.

Frequently asked questions

Who can claim the OZEV chargepoint grants?

The guidance says you need to be an OZEV authorised installer to claim the electric vehicle chargepoint grants. You apply to become authorised and OZEV sends a letter saying you are authorised, after which you can offer the grants to customers. Authorised installers must help the customer understand whether they meet the grant criteria, install only eligible chargepoint models, test that every installed chargepoint works and meets safety requirements, provide and upload all documentation, not charge customers for the grant in advance of a claim, and give the customer one invoice per application.

What evidence must be submitted with a claim?

The guidance says a claim must include the details of the chargepoints installed, meaning the make and model as listed on the OZEV eligible equipment list and the serial number, and a copy of the invoice. From 1 April 2026, claims for the flats and renters and landlord grants must also include four photos: a close-up of the charge point, a photo showing its model and serial number, a photo of the charge point with its parking space, and a wide view of the building or space. All pictures must be clearly labelled and should support the statements in the claim.

Can OZEV audit an installation after the grant is paid?

Yes. The guidance says OZEV will select some installations to be audited, and that OZEV or a third party will check grant data, statements and records held by the installer and the customer, possibly with an on-site visit. Audits may take place before or after a claim is paid. If the requested information or access is not provided, OZEV may withhold or reclaim payment of the grant and of any other claims submitted for any grant.

Which chargepoint grants are still open?

The guidance says five chargepoint grant schemes are available until 31 March 2027, after the home and workplace grants were extended for a final year from 1 April 2026: the grants for renters and flat owners, for households with on-street parking and for residential landlords, and two Workplace Charging Scheme versions. It says the staff and fleets grant, the commercial landlord chargepoint grant and the landlord infrastructure grant closed to installer claims on 26 May 2026.

What notice is given if a grant ends or changes?

The guidance says that if a grant ends or the grant amount changes, the government will aim to provide 4 weeks' notice and will honour claims made before any public announcement, subject to the grant criteria. Because the rate and platform changed on 1 April 2026, with separate contacts for claims at the new and previous rates, installers need to know which rate and platform each claim belongs to.